Parking Shed Structure(Accessories)
Parking Shed Structure(Accessories)
Parking Shed Structure :
Short installation time
Alloy frame anti-rust and mould proof
Self-cleaning membrane
Free from miantainance
Excellent appearance
Comparison between traditional welding steel structure car shed and assembly aluminum alloy membrane structure car shed
Item |
traditional welding steel structure car shed |
assembly aluminum alloy membrane structure car shed |
Result |
|
frame |
material |
common iron |
Customized aluminum alloy section |
No processing and assembling on site |
welding |
arc welding on site |
argon arc welding in factory |
stronger |
|
surface treatment |
Paint spraying on site |
Spraying in factory |
anti-rust and anti-corrosion resistance up to 3 years |
|
process |
Cutting and welding on site |
Screw coupling on site |
Installation efficiency improved |
|
Membrane structure |
Material |
Common membrane material |
Anti-wicking membrane structure |
B1 fire resistance, self-cleaning, mould proof |
Quality |
Low stretch, proteiform |
Stretching resistance, nondeformable |
Low deformation, no ponding |
|
Service lifetime |
5 years |
15 years |
Lifetime increased |
|
Coupling |
Welding fabric, tape coupling |
Full width, card slot structure |
Easy to install and change |
|
Installation |
Substrate |
Pre-buried |
Bolt embedded bar |
Save time and labour cost |
Coupling |
Cutting, welding, polish and paint on site |
Bolt coupling as the instruction |
Save time and labour cost |
|
Hoist |
With the help of crane |
No hoist |
Quick installation, low labour cost |
|
Time |
More than half month |
3 days |
Save time and labour cost |
|
Labour cost |
High |
low |
Low labour cost |
|
Assemble and disassemble |
cutting, welding, polishing and painting for second time |
Installation again with disassembled bolts |
Simple disassemble |
|
Maintainance |
Anti-rust and anti-corrosion treatment every year |
Free from anti-rust and anti-corrosion treatment |
No maintainance cost |
|
Cost performance |
Cost per square meters |
High |
low |
strong market competitiveness in lifetime, installation efficiency, maintainance cost and disassemble |
Chengdu Foresight Composite Co., Ltd.
Factory address:
No.4 Group, Longtan Township,
Guangming Village,
Chenghua District, Chengdu,
Sichuan, China
Tel: +86 28 84211071
Fax:+86 28 84298625
E-mail: carina@cdfhcl.com
Office address:
No. 11-12, 13 Floors, 3 Units,
Vanke Glamorous City,
Chenghua District, Chengdu,
Sichuan, China